WATER AND SEWER INSTALLATION UPDATE

I was at the lake for a few days this week, just got back home today. I had a good walk about to see where the construction was at. They have completely finished installing the sewer and water lines and boxes to the individual cabins on the North side of the campground to the green space. They are now working on the South side of the Park and have finished installing the sewer and water lines and the boxes to the individual cabins on 5th Street South. They have all the sewer and water lines in on 4th Street South and are almost finished the installation of the boxes to the individual cabins. They have the sewer and water lines in on 3rd Street South and are working on putting in the water and sewer lines on 2nd Street South. They work from the green space heading south and on 2nd street South they are about 3/4 of the way down. They had not started 1st Street South yet when I was there. Weather was great this week and they seem to be progressing along as planned.

I closed up my cabin so will not be going back this fall again so it may be difficult for me to keep up with the updates. I will try to keep in touch with the Park and hopefully find out from them what is happening so as to keep you informed via this website.

Posted in News | Comments Off on WATER AND SEWER INSTALLATION UPDATE

WATER AND SEWER INSTALLATION UPDATE

It is raining at the lake so I am not sure how much work will get done today but right now the contractor is working on finishing up installing the boxes to the individual cabins on Fourth Street North and Fourth Street South from N Avenue to the green belt. They are about 2/3rds complete on both sides beginning at the Avenue. There is about 1/3rd of 4th Street North to be done at the lakeside and about the same on Fourth Street South near the green belt.

Fifth Street North, and Fifth Street South from N Avenue to the green belt have all the sewer and water lines in but no individual boxes are installed yet.

They have also moved into the South side of the park and are working South from the green space. They have all the trenches dug for the sewer and water lines on Fifth Street South and are now digging the trenches for the sewer and water lines on Fourth Street South.

Posted in News | Comments Off on WATER AND SEWER INSTALLATION UPDATE

WATER AND SEWER INSTALLATION UPDATE

I hadn’t been to Clear Lake in a few weeks and have been relying on other people who were up there to give me updates and i would like to thank them very much for doing that. I was able to go this past weekend and to see first hand what all has been done. When I arrived on Friday, October 4 and had a walk around it was plain to see that they are progressing in a timely fashion. To recap: First and Second Street North and First and Second Street South from N Avenue to the green belt are complete and the streets have been levelled off and are good for driving on.

Third Street North and Third Street South from N Avenue to the green belt are complete, however, the roads have not been completely levelled off yet so are a bit difficult to drive on.

On Fourth Street North the sewer and water lines are dug in from the 4th Street North bathroom to the lake. They had just started to put the boxes in to the individual cabins beginning at the lake. They will not be digging up 4th Street North from the bathroom to N Avenue for water and sewer lines because the lines are already in there due to having the bathroom on the street. They will just be digging to put the lines and boxes into the individual cabins. On Fourth Street South they have not dug in water and sewer lines between N Avenue and the 4th Street South bathroom, again for the same reason because the lines are already there. They have dug them in from the South side of this bathroom to the green belt.

They had started digging in the sewer and water lines on Fifth Street North.

I took another walk around as I was leaving this morning and saw that they were putting in the boxes on Fourth Street North continuing south from the lake. They were also digging in the sewer and water lines on Fifth Street South starting at N Avenue and working toward the green belt.

Posted in News | Comments Off on WATER AND SEWER INSTALLATION UPDATE

WATER SHUT OFF FOR THE SEASON

The Park will be shutting off all water in the Clear Lake Campground on Tuesday, October 15, 2013 until next spring. Because of the tying in of the water lines to the existing lines it has become too difficult and too time consuming to keep the water on any longer during the construction.

Posted in Announcements | Comments Off on WATER SHUT OFF FOR THE SEASON

SEWER AND WATER INSTALLATION UPDATE

The rain slowed down work this past week as it rained on Wednesday, Thursday and Friday but 2nd Street South from Avenue N to the green belt is complete with all the connection boxes installed to each cabin. The street still has to be levelled. They have filled in the sewer and water lines on 3rd Street North and 3rd Street South from Avenue N to the green belt but the connection boxes have not been installed yet.

Posted in News | Comments Off on SEWER AND WATER INSTALLATION UPDATE

SEWER AND WATER INSTALLATION UPDATE

The heavy rains that we experienced on Monday, September 23/13 slowed construction considerably but Tuesday was a productive day. 2nd Street North has all the boxes in to the individual cabins and they are now installing the boxes on 2nd Street South to the green space. They have installed the sewer and water lines on 3rd Street North and 3rd Street South to the green space but no connection boxes yet. Construction is going well but it is very muddy right now.

Posted in News | Comments Off on SEWER AND WATER INSTALLATION UPDATE

UPDATE ON WATER AND SEWER INSTALLATION

Just to recap regarding FIRST STREET: 1st Street North, and 1st Street South from Avenue N to the green belt are completely finished with all services to each individual cabin as well as some new fire hydrants.

SECOND STREET: Second Street North, and 2nd Street South from Avenue N to the green belt have the sewer and water lines completely trenched in. The contractors are now working from the lake side on 2nd Street North to trench in and install the water boxes to the individual cabins on both sides up to the green belt on 2nd Street South.

THIRD STREET: They are also starting the trenching for the sewer and water lines from the lakeside on 3rd Street North to Avenue N.

Just a note: The sewer lines are installed on the west side of the streets and the water lines are installed on the east side of the streets.

Posted in News | Comments Off on UPDATE ON WATER AND SEWER INSTALLATION

WATER AND SEWER INSTALLATION UPDATE

Today the contractors are working on 2nd Street North. They had to start mid way down the street because they had difficulty finding existing water and sewer lines. This took much longer than expected but they are on their way to completing 2nd Street North. They are also installing the sewer lines on 2nd Street South going south from N Avenue towards the green belt. It rained today, making it very muddy.

Posted in News | Comments Off on WATER AND SEWER INSTALLATION UPDATE

WATER AND SEWER HOOKUPS

The Contractor has been instructed by The Park to do the following:

There will be a green box out in front of your cabin or
your neighbours. Inside you will see 2 curb stops, one for you and one for your
neighbour. There is a 4 inch Y buried next to the box. This is where
your and your neighbours sewer hooks up. That is what every and all cabin
owners are getting.

20130912_173304-1

The Park will not allow any additional hook ups to our main line. (water or
sewer)

If you, as a cabin owner, would like to ask the contractor to continue
construction after the box that is up to the individual and at their own
cost.

Posted in News | Comments Off on WATER AND SEWER HOOKUPS

PARTIAL CLOSURE OF WASHROOMS DUE TO CONSTRUCTION

The Park will be shutting off the water supply to all washrooms except #6, #10 and the shower building on Tuesday, September 17, 2013. The reason for this is so the contractors will not be delayed by the need to shut off and open up water lines to the area they are working in.

Posted in Announcements, Articles of Interest | Comments Off on PARTIAL CLOSURE OF WASHROOMS DUE TO CONSTRUCTION

PROGRESS WITH THE INSTALLATION OF SEWER AND WATER

1st street North is complete, they have made the loop onto 2nd street North down by the lake and are now just doing some cleanup. They have started working back at the corner of 1st Street and N Avenue and have started digging the trenches on 1st Street South heading south toward the green belt

Posted in News | Comments Off on PROGRESS WITH THE INSTALLATION OF SEWER AND WATER

Michael Rac’s Review of Cabin Area, Summer 2013

Please click on CLCG Review-1 below to open the PDF file and read/print report.

Michael Rac, Summer Regional and Urban Planning Student, was hired this past summer to collect information from cabin owners in order to complete a Comprehensive Design Review of the cabin area. This is just an overview and Michael has been hired to come back next year and complete in detail, including suggestions and recommendations for the issues identified in the pie chart. The size of the piece of pie in the chart represents the number of people in our campground who had concerns regarding these issues, the larger the piece means more people discussed that issue with Michael. Once we receive the detailed report The Board and The Park will be working together to try to resolve and improve these areas of concern.

CLCG Review-1

Posted in Articles of Interest | Comments Off on Michael Rac’s Review of Cabin Area, Summer 2013

BEGINNING OF INSTALLATION OF SEWER AND WATER TO INDIVIDUAL CABINS

Rob Smith & Son, Backhoe & Trucking Ltd., from Neepawa, MB was awarded the contract from The Park to install the sewer and water lines to each individual cabin, as well as the extra 30 lots that have been added for lease, making a total of 555 installations in the cabin area. They started digging the main trench on Tuesday, September 10, 2013 at the corner of 1st Street and N Avenue. They had difficulty finding the main water line here but once that was found they are proceeding north on 1st Street. They are now in the process of digging the trenches and laying the water and sewer lines to the individual cabins on both sides of 1st Street North.

photo-3

photo-11

Posted in News | Comments Off on BEGINNING OF INSTALLATION OF SEWER AND WATER TO INDIVIDUAL CABINS

PLACEMENT OF HYDRO POLES IN CAMPGROUND

Manitoba Hydro has been given the authority from Parks Canada to put hydro poles as they see fit on Parks land. They will insure that there are no poles placed on leased lots and they have assured Parks Canada that they will place poles as to reduce the amount of tree cutting. Parks Canada will not negotiate with cabin owners and the authority will lie with Manitoba Hydro.

Posted in Articles of Interest, Parks Canada News | Comments Off on PLACEMENT OF HYDRO POLES IN CAMPGROUND

CONGRATULATIONS REG, ONLY ONE IN A MILLION

CONGRATULATIONS TO REG MEAKIN FROM OUR CAMPGROUND ON SCORING AN ALBATROSS(DOUBLE EAGLE) IN THE 2013 TAMARAC GOLF TOURNAMENT LAST WEEK.

Posted in Articles of Interest | Comments Off on CONGRATULATIONS REG, ONLY ONE IN A MILLION

Clear Lake Cabin Association General Meeting – June 30, 2013

CLEAR LAKE CABIN ASSOCIATION 2013 GENERAL MEETING
JAMBOREE HALL
JUNE 30th, 2013

The President called the meeting to order at 10:00 A.M. There were 11 Board Members and 74 cabin owners present with one proxy recorded.

Approval of Minutes:
It was moved by Lyle Parnell, 6/11 – 4th St.S and seconded by Roy White, 4 – 5th St.S that the minutes be accepted as distributed. CARRIED.

Matters Arising Out of Minutes:
The Constitutional Review Committee consisting of Board Member Trevor Winters, and members-at-large Roy White, Joelle Robinson, Greg Fleck and Wayne Clayton. Board member Trevor Winters made the decision to meet this summer at the lake because of the distance between their residences. These meetings will commence within 2 weeks.

President’s Report:
The President gave a verbal report as the majority of the information is included in the spring newsletter which was distributed earlier this spring. Highlights of his report include the following:

Board Meetings:
The board had a busy winter, concluding with a working meeting in Portage on May 11th and a meeting at the Park on June 29th.

Releases:
As Dwight was called away on an emergency, this item was deferred until his return.

Water and Sewer Update:
The tenders have gone out, and will close on July 15th. Initial response has been very good. The Park has been very cooperative and helpful which has kept the costs down.
Lyle Parnell, 6/11 – 4th St. S. asked if the Park will fund the project forward or if cabin owners will fund the project.
Brian answered that the Park will only fund it until the project is completed. Cabin Owners will be responsible for the full amount at that time. The Park will announce the successful bidder after July 15th, and work will commence September 2nd and is expected to be completed by November 29th, resulting in congestion in the area very quickly. The Park is suggesting that owners consider closing up early this year.

Jamboree Hall:
The Park has suggested that because cabin owners are primary users of the Jamboree Hall, it would be advisable to have the Board take over responsibility for the Hall. It has been decided that Joyce Harland will handle all bookings for the Hall. A committee consisting of Joyce Harland, Joann Lombaert and Gloria Belliveau will develop a set of Guidelines for the use of the Hall and will advise on the fee for use of the Hall and set a refundable damage deposit.
Roy White, 4 – 5th St.S, moved that the Park be commended on the restoration of the Jamboree Hall. Seconded by Brent Munroe. CARRIED.

Shower Keys:
The Board is now responsible for the provision of shower keys to cabin owners. Information and keys can be obtained from Joyce Harland.

Summer Urban Planning Student:
Brian introduced Michael Rac as our Urban Studies Student for the summer. Michael will be producing a report for the Park regarding issues in our area. As such, Michael wishes to speak to all cabin owners and will be available in the Cleaners Cabin at North Street and 1st St.

Park Report:
Brian introduced Dwight McMillan, Development Officer for the Park.
Dwight spoke briefly about the work Michael Rac will be doing this summer. As an Urban Studies Student, he will be doing an intensive study of all the issues in our area. Dwight encourages all cabin owners to speak with Michael as his report will be taken very seriously by the Park. Michael will be back next summer and will do a final report at that time. Michael will be at the Cleaners Cabin, North St. and 1st St. 5 – 6 hours a day and will answer any questions you may have. If he is not available at that cabin, he will post his cell phone number and requests that owners call him so he can meet with them. Michael will be doing a comprehensive review study and will look at everything in terms of land use, which will then form part of his study.
Lynn Ash, 54 – 5thSt. S. asked if cabin owners would be able to approve the plan.
Dwight replied that there will be a review of the plan.
Michael will have a copy of the Building Guidelines and will be replacing Dwight during Dwight’s vacation.
Brian Bird, 37 – 4th St.S. asked if Michael was here through the university program.
Dwight replied that Michael was hired by the park with approval of the university.
Dwight once again urged owners to talk to Michael.
Dwight reported that work on the Jamboree Hall is still in progress. For example, the windows still need to be put in. Cost was approximately $40,000.
Jackie Chapin-Downey, 39 – 3rd St. S. -, asked if a plan would be put in place by the board.
Dwight advised her to talk to the Board, but also to talk to Michael.
Marilyn Mutter, 107 – 3rd St. S., reminded Dwight that the Community Plan was still not signed, and asked if this plan would also have to go to Ottawa for signature.
Dwight said this plan is between the Park Townsite Manager and the Board and will not go to Ottawa.
Brent Munroe, 75 – 2nd St. S. raised a concern about the 30 lots being released or lease over the next few years. His concern related to the addition of bigger cabins adding to the congestion in the area.
Dwight said that this is an issue Michael will address. He noted that adding more lots increases the revenue and should reduce costs for all cabin owners.
Jo-Ann/Lytle, 31 – 5th St. N. asked if, when this plan is in place, will there be room for adjustments.
Dwight replied that Parks, upon consultation with the Board, will look at the plan every year.
Scott Jordan said to keep in mind that things always change, therefor there will be change, this is a working plan.
Brian Bird, 37 4th St. S. asked if this study is part of a Government Plan.
Dwight said this is a local plan.
Regarding Lot Release, Dwight said that a survey of the boundaries of the cabin area was done years ago by the Park. Now an official survey of our area has been done, and there are 50 unoccupied lots, and 30 of them are prime lots. As the Park has been told they must become self- sufficient, the Park asked for permission to release the prime lots. It was decided to release the lots 5 at a time, the first 5 were released this year. One of these lots sold for $75,100. The other 4 lots are still for sale with a minimum bid of $75,100. Dwight said he will have to get a new evaluation in September, as the current evaluation expires at that time.
Brent Munroe – 75 – 2nd St. S. asked if the new evaluation came in at a lower rate, would our rates decrease.
Dwight said that they would not decrease as the rate is set when you sign your lease.
Lyle Parnell, 4/11 – 4th St.S.- asked who chose the 5 lots that were released this year. Dwight replied that staff picked the lots and Dwight approved them. Dwight said that, before release, they contacted the neighbours to give them first refusal.
William Metelski, 13 – 4th St. S. raised a question regarding buying the rights to the lease.
Dwight replied that owning the lease gives you a $75,000 asset for bank loans, etc.
William Metelski, 13 – 4th St. S. asked why we did not have to pay $75,000 this spring.`
Dwight explained that the Park made representation to Parks Canada on the basis that our fees had been $484 per year and were going to go to $2400 per year, and as a result were able to obtain a waiver of the $75,000 from Parks Canada.
William Metelski, 13 – 4th St.S asked about the remaining 4 lots tendered this spring.
Dwight said that they are still for sale, but the lowest bid is now $75,100 as was set by the lot sold.
Brent Munroe, 75 – 2nd St. S. raised the issue of debt recovery. He asked if we will have to pay $5,000 up front sewer and water.
Dwight replied that they cannot charge owners until the pipes are in the ground. Parks Canada has said there will be no amortization.
Brian Bird, 37 – 4th St. S. confirmed that our land value came in at $75,000, however as one bid this year came in at $75,100, that sets the current land value rate at $75,100.
Dwight replied that that was correct.
Brent Munroe, 75 – 2nd St. S. asked whether because, although 1 sold for $75,100, 4 others did not sell, does this lower the market value.
Dwight replied that this does not lower our value, that there is a process by which cabin owners can appeal their assessment, by starting a class action lawsuit.
Brent said he has always heard that it is impossible to win against the Federal Government.
Dwight said of the two lawsuits, one was won and one lost. A third is still ongoing.
Regarding the progress of the signing of the leases, Dwight reported that 300 leases have been completed, 200 are still in progress, and 20 have not paid. Of the 20 that have not paid, 2 owners are residing in their cabin illegally. The Park is currently dealing with this situation, and once due diligence is done, the Park may have to take action.
The tender for the sewer and water project has gone out and there has been very good response to date. The tenders close on July 15th and they will be opened at that time and we will be notified of the winning bid. The work is scheduled to begin on September 3rd and will end on November 29th.This will be a stressful time in our area. Owners may find that they do not have vehicle access to their cabins, and may have to walk in. The Park asks that owners be patient during this construction period. The roads cannot be done for a full year to give the ground time to settle.
Lyle Parnell, 6/11 – 4th St. S. – asked for an explanation on where the hook-up box will go. Will it be on either the right or left side of the property line? Will it be flush to the ground? Will we share with our neighbour? Will the sewer line be beside the box?
Dwight relied that the decision of right or left side of the box has to be made by the Site Supervisor and Construction Manager as there are so many variables (tree roots, etc.) that not all can be the same. The box will be flush to the ground, and the plan is to have two connectors in each box. The sewer connection should be within 2 feet of the box.
Len Kashton, 40 – 3rd St.’s. Will the washrooms be shut down on September 3rd?
Dwight- No, there will be as little disruption as possible.
Judy Meuller, 78 – 2nd St.S. – Will the work be starting on Labour Day?
Dwight –The equipment will come in on September 3rd.
Greg Fleck, 25 – 3rd St.S.- Will the contractors be repairing the roads and lots.
Dwight – There will be as little disruption as possible. The site is to be left flat. The lots will be muddy. After one year, the finish will be done.
Regarding the stand pipes for water, the Parks crew will be putting in a curb stop on the pipe to allow the outside water pipes to be shut down, while the washrooms can remain open longer.
Brent Munroe, 75 – 2nd St.S. asked if we would lose trees because of the sewer and water.
Dwight replied that the back lanes where most of the trees are would not be touched, only the front streets are involved, and they will be a mess next summer.
Brent Munroe, 75 -2nd St. S. asked if the roads will be paved.
Dwight – Does not know that at this time, he may have more information the middle of July.
Bonnie Barkman, 36 – 3rd St. N. – asked if there would be any changes to the direction of the roads, such as through streets, etc.
Dwight suggested owners should talk to Michael about issues such as this.
Brent Munroe, 75 – 2nd St. S. commented that he has planted trees on the lot next to his, but now that the lot lease is for sale, he is afraid that these new trees will be cut down.
Dwight replied that reforestation should only be done if it is done correctly. There is a need to plant trees, but you must know where to plant them.
Scott Ash, 51 – 5th St. S. – asked if cabin owners could be notified of the areas under construction.
Dwight relied that this would be difficult for the contractors.
Dwight reported that Robert Sheldon is no longer Superintendent at Riding Mountain.
Dwight said that the new fire Pumper Truck has not proved suitable due to the inaccessibility to parts of the Park. The Park now has a new portable Pumper which is very suitable and easy to use.
Dwight told owners that if you are planning to build or renovate, you must first contact Manitoba Hydro. He explained that there is a new step in the process of getting new or remodel cabin approvals. Before submitting your application to the Park, you must now get a Hydro point Check done. Hydro are now 8 weeks behind in doing these. You need 2 applications, a service point check and a pole to cabin check. Hydro need to know up front if you are planning to install an On Demand Water Heater. You must be up front with Hydro as this affects the service to the whole area as well as the number of poles required. On Demand Water Heaters draw more power than the rest of the household. They could cause a safety/fire hazard if their existence is not known by Manitoba Hydro. They should always be inspected by Manitoba Hydro before being used. Once the cabin owner has a service point confirmed by Manitoba Hydro, Dwight will issue a Building Permit. When asked about underground wiring, Hydro said no as the Park will not pay for it.
Jeff Sim, 12 – 4th St.N. – asked about gas powered On Demand Water Heaters.
Dwight replied that one has been allowed. The tank must be certified and the size limited to 100 lbs. as well as being CSA approved. The tank must be placed at the rear of the lot. These tanks are difficult to fill.
The President thanked Dwight for his presentation.
Brent Munroe -75 2nd St.S. asked how we will deal with the congestion of large cabins.
Dwight relied that the percentage congestion is being considered.
Brian Bird, 47 – 4th St.S. – Will Michael be looking at all issues?
Dwight relied that we have now moved out of the “campers era” and into the “lease era” which means new policies and looking forward.
Leaf Blowers- Brian reminded all that the noise restriction is 10 to 6.
Committee Reports
Vegetation –Scott Jordan asked that this report be deferred until after the sewer and water is in.
Policing – Gloria Belliveau reported that there has been a couple of attempted break-ins this spring and some vandalism. Gloria asked that all owners be aware of their areas and report any strange or unusual behaviour. Gloria also reminded all to record the serial numbers of bicycles, as it is difficult to prove ownership, even if they are turned in to the Park.
Development Review Board has been disbanded.
Marine
– John George reported that there is zero tolerance this year. He told all boat owners to make sure to register your boat and know that the numbers must be visible on your boat. Last year, one boat owner was fined as, although he had a fishing license, he did not have it on him. We now have 4 wardens here, and they have been on the lake frequently.
Dr.’s Residence – Joan James reported that some work has been done on the residence. She explained that the cabin area pays 1/3 of the expenses for the residence. The house is in need of a chest of drawers.

Clear Lake Cabin Association Treasurer’s Report as of June 18, 2013Revenue As of May 1, 2013 $5,986.95
Income from Membership Deposits 760.00
Total Revenue to June 18, 2013 $6,746.95
Expenses
Envelopes, stamps, printing for newsletter $394.73
Website hosting (May 23/13 to May 23/14) 58.80
Website domain renewal to July 24/14 8.03
Print Cartridge 28.30
Travel to Portage for Board Meeting May 11/13 713.70
Lunch for Board Meeting May 11/13 243.80
Total Expenses to June 18, 2013 $1,447.36
Total Assets to June 18, 2013 $5,299.59
Westoba Bank Balance as of June 18, 2013 $5,286.59
Add Westoba Share 5.00
Add Westoba Equity 8.00
Bank Reconciliation $5,299.59
455 (87% Paid up members to date)

Respectfully submitted by Joyce Harland, Treasurer, CLCA
The meeting was adjourned 11:45 a.m

Posted in Meeting Minutes | Comments Off on Clear Lake Cabin Association General Meeting – June 30, 2013

Lease Pickup

The Clear Lake Cabin Owner’s Leases are ready to be picked up. They can be picked up at the Park Office. The Leases are filed according to your Legal Lease Number so it would speed up the process if you have that information with you. if you do not have that information the Park people can look it up by lot number or name if need be.

Posted in Announcements | Comments Off on Lease Pickup

Summer Regional & Urban Planning Student – Cabin Area

Summer Regional & Urban Planning Student- Cabin Area

The Park has arranged for a summer student, Michael Rac, who is working on his Masters of Regional and Urban Planning, to assist with providing information on the water and sewer project and other issues relevant to our Cabin area. Michael will be available to meet with all cabin owners at the ‘Cleaners Cabin’ # 3 – 1 St South, Wednesday through Sunday between the hours of 10:30am – Noon and 1:30 pm to 5:00pm until the end of August.

This summer Michael will be collecting information and comments from cabin owners in order to complete a Comprehensive Design Review of the Cabin Area. He will be looking at various planning topics including parking and traffic, security and safety, vegetation management, and lakeshore management. The input Michael receives from cabin owners will directly influence his recommendation for the Review.

In addition he will be providing information, and able to answer questions, relating to the upcoming water and sewer project and any other development in the Cabin Area.

Michael will return next summer to present the proposals developed from these conversations and his extensive evaluation of the cabin area. This project will help the cabin owners and the Park develop long-term planning goals and design concepts for the area. So we strongly encourage you to take the time to meet with Michael at your convenience and provide your input into this study.

He can also be reached at michael.rac@pc.gc.ca or 1-204-210-0337

Posted in Announcements | Comments Off on Summer Regional & Urban Planning Student – Cabin Area

Shower Building Keys

If you need a key to the shower building email us at info@clearlakecabinassociation.org 

Posted in Articles of Interest | Comments Off on Shower Building Keys

Executive Meeting Minutes – July 4, 2013

CLCA BOARD EXECUTIVE MEETING
CLEAR LAKE
July 4th, 2013

Present: Trevor Winters, Past President, Brian McVicar, President, Scott Jordan, Vice President, Gloria Belliveau, Secretary and Joyce Harland. Treasurer.

A special meeting of the Executive Committee was held on the sidewalk in front of 2nd St. and North St. to resolve issues regarding the Jamboree Hall, the Shower Keys and links to our website.

Jamboree Hall: The following rules were decided and will be posted on the website:
Daily fees were set at $80 for Association cabin owners, $100 for non-association cabin owners and $150 for non cabin owners. An $80 damage deposit is required and will be refunded when the Hall and area are clean. It is suggested that the fee and deposit be made in separate cheques. Payment to be made at time of booking, or within 1 week if by mail.
The fee is non-refundable if cancellation is made within 30 days or less of event.
The Jamboree Hall and area must be left clean.
As per National Park Policy, no confetti or confetti like products are allowed.
A quiet atmosphere and environment must be respected.
There is no parking available.
All events must end by 11:00 p.m.
All persons attending an event must have a valid Park pass.
Events may occur between the May long week-end and the Thanksgiving long week-end.
Bookings for the Jamboree Hall may be made by contacting Joyce Harland by telephone or text at: 204-250-7965.

Shower Keys – Replacement keys may be obtained by cabin owners from Joyce Harland. Phone or text: 204-250-7965.

Links to Website: To avoid showing favouritism, we decided not to become involved in linking at this time. Joyce Harland will contact the Erickson Credit Union and thank them for their interest, but inform them of our decision.
Meeting Adjourned

Posted in Meeting Minutes | Comments Off on Executive Meeting Minutes – July 4, 2013