UPDATE ON WATER AND SEWER INSTALLATION

Just to recap regarding FIRST STREET: 1st Street North, and 1st Street South from Avenue N to the green belt are completely finished with all services to each individual cabin as well as some new fire hydrants.

SECOND STREET: Second Street North, and 2nd Street South from Avenue N to the green belt have the sewer and water lines completely trenched in. The contractors are now working from the lake side on 2nd Street North to trench in and install the water boxes to the individual cabins on both sides up to the green belt on 2nd Street South.

THIRD STREET: They are also starting the trenching for the sewer and water lines from the lakeside on 3rd Street North to Avenue N.

Just a note: The sewer lines are installed on the west side of the streets and the water lines are installed on the east side of the streets.